Here's a picture of the floor after scraping, and with the primer on it. I scraped all the old paint off with a carbide scraper. Most of it was already loose and peeling. I didn't get all of it off, and they say to get it all off. We'll see if it makes a difference. After scraping, I used the degreaser, it was really hard to rince off. They say for best results, to wash it off with a pressure washer. Well, I'm not going to use a pressure washer in the basement. So it took me over an hour to rinse and clean if off with a bucket and mop. Next came the primer which was relatively simple. The work bench is still in there, because it was too wide to fit through the door. I'll have to move it, and then do that part later.
Here's all the stuff from the shop, in an adjacent room. Including my new band saw.
Here's a shot of the power tool bench. The floor colour is called Fedora. It looks good with the wall colour, Mochachino. It looks a lot better than the red and tan that was on there before.
I still have some drywalling to do, I want to get the foam covered since it's not that safe. There's some pipes in the way though, and we're planning on replacing the main pipe to the house, so we'll have to be doing all that soon enough. As well, we're supposed to have 3/4" pipe to the water heater, so we have to do a bit of plumbing. Once the walls are done, I can start hanging and organizing everything properly. Hopefully we'll have a working workshop soon enough.
Showing posts with label organization. Show all posts
Showing posts with label organization. Show all posts
Thursday, January 29, 2009
Working on the Workshop
Posted by
Derek
at
8:59 p.m.
0
know it alls
Labels: organization, paint, workshop
Saturday, January 3, 2009
Working on the Workshop
Here's the stairwell to the shop. I finished drywalling it, and it's got a coat of paint on it now. The top is plaster that isn't in very good condition. I'm going to have to use plaster washers to resecure it. I'm going to trim it out with rough cedar, to give it kind of a rough look.
I've been drywalling the shop, and moved the bench I use for power tools. The table top is cut to fit in this niche. It's attached to a ledger at the back, and to the cabinet. I'm going to build shelves on both sides, and above. Hopefully it's going to be more organized.

Here's the wall on the other side, that I haven't finished yet. I have to change some of the plumbing so I can finish drywalling the one wall. I ran out of Tuck Tape too, and I didn't feel like going out in the snow again. I'm going to build shelves, and places to hand all my hand tools, like chisels and planes.

There was a wall build about 2' in front of the chimney, so I removed that, and continued the wall along beside the chimney. The 2' was kind of wasted space, so I reclaimed it for the shop.
Here's the wall on the other side, that I haven't finished yet. I have to change some of the plumbing so I can finish drywalling the one wall. I ran out of Tuck Tape too, and I didn't feel like going out in the snow again. I'm going to build shelves, and places to hand all my hand tools, like chisels and planes.
There was a wall build about 2' in front of the chimney, so I removed that, and continued the wall along beside the chimney. The 2' was kind of wasted space, so I reclaimed it for the shop.
Posted by
Derek
at
5:53 p.m.
0
know it alls
Labels: drywall, organization, workshop
Subscribe to:
Posts (Atom)