Trim is currently being stained. This is the bathroom and dining room doors, I took the 2 corner pieces off, because I couldn't fix the plaster without taking them off. I didn't want to take off all the trim, since it's a little brittle.
View down the hall, the pantry door is currently taken off for stripping and varnishing. The butterfly hinges say they're made in Sweden.
Painted heat vent and door stop from Rejuevenation Hardware. There's a lot of sapwood in this piece of trim. The trim was originally faux bois (painted wood pattern), I could see some of it on the grate. Must have looked crazy with the grate painted to look wood.
Saturday, June 30, 2007
Progress Pics
Posted by Derek at 8:51 p.m.
Labels: electrical, framing, plumbing, trim
Subscribe to:
Post Comments (Atom)
2 comments:
That looks great! Your a getting things done which is so hard to do when summer comes and there is so much more fun things to do. I'm following your powder room progress as we have a toilet hooked up in our basement without any walls. There is a shower curtain hanging around it. That's how it was when we bought the house and we don't use it so we just left it. I'd like to make it a powder room, too.
Well at least the plumbing is already there, you just have to frame around it, and add a sink.
Post a Comment